How to Build a Business Case for Machine Monitoring Software

Build a business case for machine monitoring software: baseline, five value levers, targets, costs and risks, with published results as reference points.

A rugged tablet showing production charts on a rail beside a powertrain machining line

TL;DR

  • Build the case on four value levers: machine availability, avoidable idle time, labor and energy. Add capacity for new orders if you have unmet demand.
  • Measure your own baseline first. Published results are reference points, not guarantees.
  • Quantiix publishes four case studies: +10% to +30% availability, about €700K per year in workforce cost, a 14% energy cost reduction and an unplanned €4M purchase order.
  • Installation without rewiring, PLC integration or downtime keeps the cost and the disruption side of the case small.

Start with a baseline

A business case is a comparison, so the numbers that matter are yours. Before you talk to any vendor, record for a representative period: availability by machine, idle time by reason, labor cost by shift and energy consumption. The case studies on the Quantiix Solutions page use exactly these measures, which makes them a useful template.

The five value levers

Lever Published evidence Measure in your plant
Availability Eckart Hydraulik: +30% within four months. ROTHENBERGER: CNC and milling up 28%. HENLE: +10% Availability by machine and shift
Avoidable idles HENLE: setup idles −41%, lack-of-material −67%, lack-of-staff to zero Idle hours by reason
Labor SAMSON AG: about €700K saved per year Cost per shift, temporary labor
Energy SAMSON AG: 14% lower, 2.27 GWh down to 1.95 GWh (Jan to Sep 2018 vs 2019), over €60,000 saved kWh per period, idle machine energy
Capacity for orders ROTHENBERGER: unplanned €4M purchase order in Q4 from increased capacity Orders declined or delayed for lack of capacity

Lever 1 and 2: Availability and idle time

Availability is usually the headline, and idle classification is how you reach it. HENLE Baumaschinentechnik reached +10% availability by classifying idles and removing the avoidable ones, without heavy investment. For your case, convert extra available hours into value: what is an additional productive hour of this machine worth to you, and how many hours are realistic?

Lever 3: Labor

SAMSON AG used real-time monitoring to improve its morning and afternoon shifts and eliminated a night shift staffed by temporary, less experienced and more expensive workers, for about €700K saved per year. Check whether you have a similar shift or overtime pattern that visibility could change.

Lever 4: Energy

SAMSON AG reduced energy cost by 14% by preventing idle machine periods, so machines either run and make parts or are turned off. Its energy use fell from 2.27 GWh in January to September 2018 to 1.95 GWh in the same period of 2019, saving over €60,000. Quantiix also lists energy analysis at machine, line and plant level among its five advantages.

Lever 5: Capacity and revenue

ROTHENBERGER Group saw CNC and milling availability rise 28% between October 2020 and January 2021, and secured an unplanned €4M purchase order in Q4 because of increased capacity. If you turn away or delay work, added capacity from existing machines can matter more than any cost saving.

Put it together

For each lever, write one line:

  1. Baseline: your measured number.
  2. Target: a range anchored on published results, set conservatively.
  3. Value: what the change is worth per year in your currency.
  4. Cost: the vendor’s quote for hardware, software and your team’s time.
  5. Timing: the published studies report results over windows of about four months.

Annual value is the sum of the levers that apply to you. Compare it with the annual cost, and show a conservative and an expected scenario.

Present three scenarios

Management trusts a range more than a single figure. Build three versions from the same structure:

  • Conservative: availability gain at the low end of the published range (+10%, as at HENLE), with no labor or capacity effect.
  • Expected: a mid-range availability gain plus the idle reductions your own data shows are avoidable.
  • Stretch: gains close to the upper end of the published range (+28% to +30%), plus labor, energy or capacity effects if your baseline supports them.

Show the payback for each, and make the pilot the decision gate: approve a small, time-boxed test with agreed metrics, then decide on scale-up.

Keep the cost side honest

Quantiix states that installation needs no rewiring, no PLC integration and no production downtime, so the rollout itself should not cost you output. Ask the vendor to put hardware, software, support and onboarding in writing, and include your team’s time for labeling.

Address the risks

Published figures are customer-specific. Ask for references in your industry, run a pilot on your own machines, and agree on the metrics and period before you start. Quantiix states up to 90 minutes from first sensor to live data, so a pilot can produce evidence quickly.

Check before you submit

  • Every number has a source: your own data or a named published case.
  • Your targets sit below the published results.
  • The cost includes your team’s time for labeling and review.
  • The pilot has defined metrics, a defined period and a named owner.
  • The case states what happens if the pilot misses its targets.

Bottom line

The strongest business case is built from your baseline, a conservative target for each lever, and a pilot that tests the assumptions. For reference points and a pilot, contact sales@Quantiix.AI.

FAQ

What should a machine monitoring business case include?

A baseline, the value levers that apply, targets, costs, timing and risks.

What results can I reference?

Quantiix publishes +10% to +30% availability, about €700K per year in workforce cost, a 14% energy cost reduction and an unplanned €4M purchase order.

How soon are results visible?

Quantiix states up to 90 minutes to live data per machine. The case studies report results over windows of about four months.

Does installation disrupt production?

Quantiix states no rewiring, no PLC integration and no production downtime.

Are the published results guaranteed?

No. They describe individual customers. Verify with references and a pilot.